Featured Projects
Katherine Cotton Gin – $12.7M
-
Design & Construction of NT’s first cotton processing facility
-
Includes offices, worker camp, weighbridge & sewage system
-
Bulk Concrete Installation
-
Full site hydraulics
-
RO Plant, Fire system
Pine Creek Process Water Dam & Spillway Upgrade – $1.7M
-
Spillway upgrade to handle maximum flood levels
-
Integrated low-flow channel for environmental control
-
Erosion Protection Measures
-
Tailing Storage Facility Upgrade
Acacia Farms Mango Packing Facility – $1.5M
-
1,200m² facility with 500m² forklift-accessible cold storage
-
Completed two weeks early for record 4M kg mango harvest
Hayes Creek Tailings Storage Facility Spillway Upgrade
-
Eroded Spillway upgrade with Hydraulic Energy Dissipater